For renovation projects or the construction of new buildings incorporating unconventional, ‘daring’ architecture, it is not always possible to treat building projects according to the stipulations of current legislation. The same applies whenever a building project is to be planned in accordance with so-called performance-based fire requirements. In such cases,
DBI draws up a fire strategy containing proposals for alternate protection measures that ensure adherence to the overall, legally required level of fire safety and prevention.